The rig is a Friede & Goldman JU2000E design built by Dalian Shipbuilding Industry Corporation (DISC) in 2007. She is able to work up to 400ft of water depth and 30,000ft of drilling depth.
Noble Roger Lewis
-
escveritas
- Site Admin
- Posts: 3699
- Joined: Sat Aug 29, 2020 5:40 am
- Location: Singapore
- Contact:

Noble Drilling Jack up Rig Noble Roger Lewis is contracted by Saudi Aramco to drill offshore Saudi Arabia from Mar 2017 to Mar 2022. For the period from January 1, 2021 through December 31, 2021, dayrate has been adjusted to $139k while drilling for gas and $90k while drilling for oil, after which time the dayrate is scheduled to return to $159k. The Rig has worked until Mid Feb 2021 when she is put on standby and the standby rate period began.
The rig is a Friede & Goldman JU2000E design built by Dalian Shipbuilding Industry Corporation (DISC) in 2007. She is able to work up to 400ft of water depth and 30,000ft of drilling depth.

The rig is a Friede & Goldman JU2000E design built by Dalian Shipbuilding Industry Corporation (DISC) in 2007. She is able to work up to 400ft of water depth and 30,000ft of drilling depth.
-