[Turkey] Sakarya III FPU
Posted: Mon Sep 01, 2025 4:06 am
Wison New Energies has officially signed the EPCIC (Engineering, Procurement, Construction, Installation, and Commissioning) contract with Turkish Petroleum Corporation (TPAO) for the Floating Production Unit (FPU) project in Phase 3 of the Sakarya Gas Field.
Located approximately 170 kilometers offshore in the Black Sea at a water depth of 2,150 meters, the Sakarya Gas Field was discovered in August 2020 with proven gas reserves of 405 billion cubic meters (BCM). As Türkiye's largest-ever natural gas discovery, the field is being developed in three phases by Turkish Petroleum Corporation (TPAO). As a centerpiece of Phase 3, the FPU has to meet the Black Sea's challenging conditions, including deepwater operations at 2,150 meters and navigating the Bosphorus Strait's 56-meter air draft restriction. The FPU is designed with a gas export rate of 25 million SCMD (883 MMSCFD), a produced water treatment capacity of 1,350 sm³/d, and a MEG regeneration and injection capacity of 2,503 m³/d for hydrate inhibition, with a minimum 30-year design life.
As a leading provider of clean energy technology and solutions, Wison New Energies will leverage its accumulated expertise and extensive experience in offshore engineering to ensure high-quality project execution.