[Turkey] Sakarya III FPU

Post Reply
escveritas
Site Admin
Posts: 3699
Joined: Sat Aug 29, 2020 5:40 am
Location: Singapore
Contact:
Singapore

Image

Wison New Energies has officially signed the EPCIC (Engineering, Procurement, Construction, Installation, and Commissioning) contract with Turkish Petroleum Corporation (TPAO) for the Floating Production Unit (FPU) project in Phase 3 of the Sakarya Gas Field.

Located approximately 170 kilometers offshore in the Black Sea at a water depth of 2,150 meters, the Sakarya Gas Field was discovered in August 2020 with proven gas reserves of 405 billion cubic meters (BCM). As Türkiye's largest-ever natural gas discovery, the field is being developed in three phases by Turkish Petroleum Corporation (TPAO). As a centerpiece of Phase 3, the FPU has to meet the Black Sea's challenging conditions, including deepwater operations at 2,150 meters and navigating the Bosphorus Strait's 56-meter air draft restriction. The FPU is designed with a gas export rate of 25 million SCMD (883 MMSCFD), a produced water treatment capacity of 1,350 sm³/d, and a MEG regeneration and injection capacity of 2,503 m³/d for hydrate inhibition, with a minimum 30-year design life.

As a leading provider of clean energy technology and solutions, Wison New Energies will leverage its accumulated expertise and extensive experience in offshore engineering to ensure high-quality project execution.
Post Reply

Return to “Wison”

  • Information
  • Who is online

    Users browsing this forum: No registered users and 1 guest