
Project Scope:
• Fabricating and installing new heli-deck and outfitting
• Fabricating and installing bow loading A-frames and piping to existing drop line
• Additional accommodation for 25 people by adding additional bunks.
• Installing new fresh water generator and related pipe modification.
• Installing CCTV cameras and chain stopper load cells.
• Dry docking and repair.

